Odoo 20 for manufacturing: what's new in BoM, MRP, quality and PLM
Short answer
Odoo 20 came out in September 2026. For manufacturers, the big gains are continuous production (the next step can start before the whole batch is done), splitting a manufacturing order that's already running, BoM comparison, and a vendor quality rate. The big catch: the Flexible Consumption field on BoMs is gone, Blocked option included. Every MO now behaves as if it were set to Allowed, so if you relied on Odoo to stop people over-using parts, plan a new control before you upgrade.
Here's what that means in practice: an operator can now book 120 screws on a BoM that calls for 100, and nothing stops the MO from closing. If that matters to you, it's the first thing to test. The rest of the release is mostly good news.
This guide goes through it in plain language, for owners and production managers at small and mid-sized manufacturers. Every change listed here comes from Odoo's official Odoo 20 release notes.
To be clear, this is our reading of the release notes plus our advice. We haven't run these tests on a client database yet. For the non-manufacturing changes, read our Odoo 20 overview.
The short list
| Area | What changed in Odoo 20 | Why you should care |
|---|---|---|
| Bills of materials | BoM comparison, extra costs on the BoM, components and sub-assemblies edited on the BoM form, a "Used In" button on products | Product costs get closer to reality, and you see what a component change will touch |
| Manufacturing orders | Continuous production, split an MO in progress, estimated and real cost, reset done or cancelled MOs to draft | Less idle time between operations, clearer margins |
| Planning | MOs scheduled as early as possible, list order sets priority, backorders planned for you | Planners stop dragging orders around by hand |
| Work orders and Shop Floor | New work order Kanban, drag-and-drop Gantt with an employee view, one Produce button, work center barcode scan | Simpler screens for operators |
| Quality and PLM | Vendor quality rate, failure location on checks, new products through an ECO, one ECO report with cost comparison | Better supplier reviews and cleaner engineering changes |
| Inventory and purchase | Suggested min and max levels, one traceability report with expiry dates, stock aging report, landed costs per product | Less dead stock, faster recalls |
Bills of materials
BoMs get four practical upgrades. You can now compare two BoMs by quantity, in Manufacturing and in PLM. If you keep several versions of one product, this saves a spreadsheet.
You can also put extra costs straight on the BoM, like packaging or outside processing. Components and sub-assemblies can be managed from the BoM form itself. And the product form has a new "Used In" button that lists every BoM line using that component. Click it before you swap a supplier part.
One small change to the BoM overview: the Status and Availability columns are now a single column.
Manufacturing orders and scheduling
Continuous production is the headline. A work order can record how many pieces are finished, and the next operation can start on those pieces right away. In older versions, a work order couldn't hand a finished quantity to the next one, so most plants waited for the full batch, say all 500 pieces.
You can also split an MO that's already in progress. Make 300 today and the rest next week, without cancelling anything.
- Replenishment can create draft or confirmed MOs. You pick, per manufacturing operation type.
- MOs are scheduled as early as possible by default. The order of the list sets priority, and backorders of planned MOs are planned for you.
- The MO shows an estimated cost while it runs and the real cost when it closes.
- Done or cancelled MOs can go back to draft.
- Finished goods can go straight into the package set on the MO.
- Subcontracting shows up in component status and the MO overview, and subcontracted receipts take their cost from the vendor pricelist when there is no purchase order.
Work orders and the shop floor
Operators get the most visible changes. There's a new Kanban view for work orders, and the MO Kanban now groups by week and shows component status, work center, deadline and time left. The Gantt chart is drag-and-drop, has an employee view, and lets you confirm work orders, even drafts, right from the chart.
In Shop Floor, the old Produce and Produce All buttons are now one Produce button. Operators can pick a work center by scanning its barcode, and MO notes support formatting. Work orders can also be processed when the work center is blocked, which is handy, though some plants will want to know who did it and why.
Maintenance gets Gantt views for equipment and work center requests, and each maintenance team can have its own stages.
Quality and PLM
The vendor quality rate is the one we like most. Odoo scores each vendor from the quality checks on their products, so supplier reviews start from numbers instead of memory.
- When a check fails, you can set a failure location for the rejected goods.
- Quality admins can validate a transfer without doing the checks. Useful in a rush, risky as a habit.
- New products can be introduced through an ECO, and the product form tracks versions.
- Bumping the version when you apply an ECO is now optional.
- One ECO report shows every BoM change along with a cost comparison.
Inventory and purchasing
- Reordering rules can suggest min and max levels from your demand history, a target number of days of cover, and how often you order.
- Traceability shows lots upstream and downstream in one report, now with expiry dates. That makes a recall a lot faster.
- A new stock aging report shows how long stock has been sitting.
- Landed costs can be added to specific products.
- You can edit a PO's expected arrival date, and Odoo keeps the vendor's original date for on-time stats.
What can break when you upgrade
None of these should stop you from moving to Odoo 20. They decide how much testing you need. Run each one on a copy of your database:
| Change in Odoo 20 | Who it hits | What to do |
|---|---|---|
| Flexible Consumption field removed, so there is no more Blocked option | Plants that set BoMs to Blocked | Add a quality check or an approval step for over-consumption |
| Produce All removed and merged into Produce | Operators, and anyone with written work instructions | Update training sheets and screenshots |
| Order to max removed and merged into one Order button | Buyers who use replenishment | Recheck reordering rules. Advance orders now order max minus forecast |
| Lots and serials always generated when the MO closes | Shops with their own lot numbering step | Test the full lot and serial flow |
| Under Repair status removed from Repairs | Repair and service teams | Fix reports and filters that use it |
| Tracking values are no longer stored and are built on the fly, which changes features such as stage duration | Reports that measure time in a stage | Plan an extra module if you need those values stored |
| Access rights work differently | Anyone with custom manufacturing code | Rebuild and test custom modules for Odoo 20 |
Not sure which of these affect you? Ask for a free upgrade audit. We check your BoMs, MOs and custom code against the Odoo 20 changes and send back a written list of what will break. Ask for the audit.
Is it worth it? A quick way to check
We can't promise a number for your plant, so this is how to work out your own. The figures below are an example. Swap in yours.
Say a product goes through three operations and each MO waits about a day at the handovers. With continuous production, the next station starts on finished pieces instead of waiting for the full batch. If that saves one day per MO and you run 40 MOs a month, each MO finishes a day sooner.
Now put a price on that day. Suppose one day of waiting on an MO costs you $40, for example two hours of overtime at $20. That's $1,600 a month, or $19,200 a year. Against an upgrade of $2,800 to $5,600, that's roughly a 3:1 to 7:1 return in the first year. If your number per MO is closer to $10, the return drops below 2:1 and you can probably wait. The cost side here leaves out your own team's time for testing and training, which is often a week or two of a key user's time spread over the project.
If you're on Odoo 17 or older, the case is simpler: you're running an unsupported version, and the upgrade is coming anyway.
Should you upgrade now?
| Where you are | Our advice |
|---|---|
| Odoo 17 or older | Plan it now. Odoo 17 standard support ended in September 2026. See Odoo 17 to 20 migration. |
| Odoo 18 | Support is planned until September 2027. Run a test upgrade this year. See Odoo 18 to 20. |
| Odoo 19, mostly standard | No rush. Move when continuous production or split MOs would pay off. See Odoo 19 to 20. |
| BoMs set to Blocked, or lots of custom MRP code | Test first, and plan for the removed settings above. |
How to plan it
- Write down today's numbers: average MO lead time, waiting time between operations, scrap rate and on-time vendor delivery. You'll want them later.
- List your apps, custom modules, Studio changes, reports and integrations, including scales, machines and label printers.
- Upgrade a copy of the database and leave the live one untouched until go-live.
- Run real orders on the copy: one MO per product family, a subcontracted order, a failed quality check and an ECO.
- Train operators on the single Produce button, Shop Floor and the new Gantt.
- Go live in a quiet week. After 60 days, compare against the numbers from step 1.
For most manufacturers, the upgrade takes about 3 to 8 weeks and fits our Medium or Large Success Pack ($2,800 to $5,600, or AED 10,300 to 20,600). You get a fixed quote after a free audit. More on our Odoo migration and Odoo manufacturing services.
Frequently asked questions
What is new in Odoo 20 for manufacturing?
Continuous production, splitting an MO in progress, BoM comparison, extra costs on the BoM, a new work order Kanban and drag-and-drop Gantt, a vendor quality rate, suggested min and max stock levels, and one ECO report with cost comparison. All of it is listed in the official Odoo 20 release notes.
What is continuous production in Odoo 20?
A work order can record how many pieces are finished, so the next operation can start on those pieces before the whole batch is done. It cuts waiting time between operations.
Can I split a manufacturing order in Odoo 20?
Yes. You can split an MO that is already in progress, make part of it now and the rest later, without cancelling it.
What was removed from manufacturing in Odoo 20?
The Flexible Consumption field on BoMs, including the Blocked option (every MO now behaves as Allowed), the Produce All button (merged into Produce), the Order to max button (merged into Order) and the Under Repair status in Repairs. Lots and serials are now always generated when an MO closes.
How long does an Odoo 20 upgrade take for a manufacturer?
Usually about 3 to 8 weeks. It depends on custom modules, integrations and how many product families you test. OdooVizion gives a fixed quote after a free audit.
Odoo Certified Partner Teams in the USA & UAE Reply within 1 business day
Planning an Odoo 20 upgrade for your plant?
Tell us your Odoo version and what you make. We'll reply within 1 business day with a fixed scope and timeline.